Sunday, July 5, 2015

How is this a thing?

The amazing spider web. Two pieces of single strand webbing and a long static rope slinging three blocks.

Note how the rope and webbing are jammed into the crack by a piece of bark.

Five anchors in a single point of failure, that is cross loaded.

Seven MM as an anchor. Note the snappy overpriced plastic tube they bought.

Two quick draws used instead of carabiners. This adds 4 single failure points. The pricey carabiners in the draw will get dinged up, abrading the rope and failing to open just when you want. Note the bent gates, for easy opening. Is easy opening what you want in your top rope anchor?

Is this equalized? No, this is bastardized.

Friday, July 3, 2015

Fun with webbing.

First sling one strand around the tree.

Looks like a double overhand, maybe.

Add another sling...

...and some white static rope

Holiday madness.

Single strand webbing strangling a root.

It is a solo rig. Three quick draws are the first sign of overthinking.

Alpine runners grinding away on the rock. This anchor was loaded with every move.

A tiny tree as anchor.

Monday, June 29, 2015

More miniature hardware.

Two tiny nuts for an anchor.


The real anchor is a single strand of 9/16" webbing. It is under tension, the nuts aren't.
The second climb has an 8MM correlate for an anchor, period.

Sunday, June 28, 2015

Hardware epidemic.

OK, once more, this rock breaks. It doesn't care how long you have been climbing, who you work for, or how good your gear is, it just breaks. The cam at the center moved when the flake moved. 

More of same.

At least this was bedrock.

Nice tree. See the pile of sawdust at the bottom? Somebody is eating it from the inside.

The blue sling is around a bunch of sharp edges, at least there are 2 other anchors, but the blue sling appears to be holding all the weight.

Two slings around the refrigerator. It's big, but attached to absolutely nothing.

Thursday, June 25, 2015

He said, "I've got 180 feet of static." I said, "That doesn't mean it"s a good idea to use it all."

Shiny new carabiner and webbing. This was club night, people are trusting members' anchors.

He made a gigantic loop, the climbing rope is 25 feet further into the foreground. He said, "I wasn't sure if I could trust the rock here." Cautious, OK ASK SOMEBODY.

This is what he went 90 feet in search of. Note the figure 8, overhand knot, and carabiner just in case.

Sunday, June 21, 2015

Hot, wet, OK if you're desperate.

Almost perfect, a more secure tie off would be better.

A lot of thought, but not so good. He could have used the rope, instead he added the runner, a single carabiner, an unstable clove hitch, and the so-called backup knot and carabiner. The 1" runner is great protection from friction, too bad it is in the air.

Maybe when they load the rig, they won't have as much friction.

Could be worse, lots of air around the hex but nowhere for it to go. OK if the rock wasn't prone to breaking and kids steal hardware from anchors.